Project
Castleside
Client
The Panacea Museum
Location
Bedford
Work Included
Castleside property was renovated back to its original glory to accommodate a museum for the Panacea Charitable Trust in Bedford. Wadys undertook the Electrical Building Services installation. We installed modern systems while visually creating a building of the 1900’s using period accessories to match the buildings heritage. This was a brand-new installation of the power and lighting using Bespoke Display Lighting Systems, Emergency Lighting using a central battery system, rewired with Fireproof cabling throughout and a full Aspirated Fire Alarm System installed. The outcome provided a fully functioning property with modern systems without ruining the character of the building.
Other HISTORICAL projects include